Tuesday, September 13, 2011

Finished

One set of cabinet completely finished from top to bottom!
Turned the light off to take pictures, but the light rail under the cabinet really finishes things off.  Looks really nice.

TV back on the wall.
Had to order more supplies, so I think it is back to work on the crown molding.



Friday, September 9, 2011

Labor Day Bonus Project

Jim always says it is amazing how much you can get done when you don't have to go to work.  This couldn't have been more true over Labor Day.  He got home a little early on Friday and had three full days off from his real job.  So besides the back splash he got a good start on another project.

The dreaded crown molding!
Many, many trips to the shop and back.
Looks really nice - Jim is not completely happy with it, but his is always overly critical of his work.
One section down, one small and one huge section left.

Monday, September 5, 2011

It Gets Even Better!

Picked up the 3 sheet of tile that had to be ordered on Thursday of last week.  Jim installed the 2 remaining sections on Thursday evening and Friday. I thought it looked great and couldn't get any better, but it did.  The grout is the bomb!
Last 2 section to be tiled.
Finished early enough on Friday to go get a cotton candy Smashing Delight! (last one of the season)
The grout.
No one on the home improvement shows ever mentions how dirty and messy this process is.
Or how you will be wiping sand off your counter top and floor for a long time.
But, it is definitely worth the dirt and sand for the finished result.
All done except the sealer.  The back splash may be my favorite part of the kitchen so far. Or maybe the granite, or the cabinets, the table, the stove, maybe I just love it all!!  

Saturday, August 27, 2011

I've Been Replaced

I didn't think you could actually hold a hose incorrect, but obviously I was mistaken.  Jim took time before day three of back splash installation to improve his wet saw station.  After that things proceeded quite smoothly.

New and improved wet saw.
Seems to work well.
Whole lot of things to go around here.
Ta da! - used up a lot of  pieces, looks great.
Came up a few sheets short.  Had to order them, so another project on hold.
Sure do like it!



Sunday, August 14, 2011

Update the Resume

Not mine, but if anyone knows of a 2-3 day a week job that lets you come and go as you please and flip flop your days, let me know.  I'm in the market.  Oh, and I want paid well too.  

But Jim can now add "Tileman" to his extensive resume.  

We started the back splash this weekend and I will have to say it has gone very, very well.  This may be one of his true callings.

He bought a wet saw but since the tile we are using are 2"x 2" on mesh it really didn't work that well.  So we pulled out the old hoof grinder and I supplied the water and it worked like a million bucks.  So if anyone needs some tiling done (especially large ones) I know the guy to do it and he has his own saw.
Preparing the work area.

Day one saw station.
No turning back now.
We have tile!
Supper break.  I left out the measuring, cutting, measuring, trying, measuring, cutting that went on between preparing the work area and the first tile going up.
End of day one.  I love it!
Day two wet saw station.
An afternoon of more measuring, fitting, measuring, cutting, fitting, cutting & gluing and we stopped.
Grout and sealant to be added and I'm sure it will change the appearance a little, but I'm really happy with our choice.  Which is good because it took me long enough to decide.





Tuesday, July 5, 2011

Let the Decking Begin!

Well, the all important phone call came on June 23rd, the decking is in!  That actually worked out great as Jim was starting his vacation at noon on the 24th.  As things usually work for Jim especially when dealing with Home Depot, after 1 1/2 hours of waiting while they found where they had put the decking and dug it out, he was on his way home to start the deck and his vacation!



The long wait is over.
Had to make a pattern first.  Lots and lots of angles to cut.
First board ready to be placed!
Reinforcements have arrived.
Day one of vacation over, bedtime.
Day two
Who knew deck building was a spectator sport.
New color added.
Nice!

Tuesday, June 28, 2011

Back to the Deck

Well, the weather improved, so the latest kitchen project is 3/4 complete and there is a pretty good chance it will stay that way until the deck is finished.
While we have been waiting for Home Depot to get with it, Jim has been doing some of the things he probably would have done after the deck boards were on, so it was time well spent.


Sunday, June 26, 2011

Round One to the Varnmit!

Unfortunately I do not have any pictures to document this but there was quite a ruckus in the shed on Thursday evening.

Jim had turned on his fencer every night since Sunday, and every morning he would go to feed the cats and everything was just as he left it. He unplugged the fence, fed the cats and all was well in his world.

Thursday night we went to the Cardinal ball game and got home late and he did not plug in the fence.  Friday morning, chaos.  The garbage can, lid off, turned over and the fence was torn off the post.  Jim didn't think getting a picture was important.  Wish I had been there.

Jim now has a renewed determination to rid the shed of all animals that do not have names.  I think these are safe.

6-27-11 One less raccoon in the shed!

Monday, June 20, 2011

Update

No visible breech of the perimeter.  Both dogs are here.  Greeny has been accounted for, Frank is missing in action, but has been since Daisy got here.  Jim refused to look in the dirt for critter prints so we don't know if they even came in the shed or if they got a little "shock" and left.

Will see what tomorrow brings.

Sorry, kitchen update got bumped for nice weather, again.

Sunday, June 19, 2011

Looks Like Trouble!

 This can not turn out good.

For several months, maybe years we have had an on going battle with varmints in the shed eating the cat food.  In the beginning they would just eat what was left in the bowl, but over the years they started getting in the containers.

We resorted to several different ways of exterminating the varmints (mostly raccoons) and usually kept the population down.

We put the cat food in a garbage can with a lid, they would take the lid off.  Then we got a garbage can with a lid that clamped down.  That work really well for a long time, but they seem to be raising smarter raccoons these days.  Jim would wire the handles down, lid would be off in the morning.  He would wire the handles down and run a rod through the handles, lid would be off in the morning, cat food gone.  So now as a last resort, Jim has come up with another solutions:

It looks like he has made a shrine to honor them, but I would be very careful if I was Mr. Raccoon.
(Results posted tomorrow)

An actual kitchen post coming tomorrow!!

Memorial Day Weekend - Last Day

After many meals and
some pool time,
It's time to clean up and everyone headed for home.


Great Weekend!