Saturday, August 29, 2009

Friday, August 28, 2009

Paint!

Jim was ready to have me committed over my obsession with paint colors. He accused me of picking the same color just with different names from different stores. He says I've been watching too much HGTV. But finally after one more trip to Home Depot we have color.

First up the ceiling.
Cinnamon Cake



Wednesday, August 26, 2009

To Tired to Post

I actually had to do some physical labor on the kitchen this past weekend. I primed the new walls in the kitchen and the entire ceiling in kitchen/dining room/hallway.

Jim spent most of Saturday sprucing up the outside. He mowed around the pasture and ditches with the "man killer."

Sunday he spent all day in the attic adding new light, fixing old lights and running some new wire to connect ceiling fixtures. He thought is would be a nice cool day to get in the attic - but he was wrong. It was really hot up there, but that was his last trip to the attic. (let's hope)

So I was too tired to take pictures and post them. I will do better this weekend. I'm hoping to put some color on the wall. So instead of pictures of the kitchen enjoy these.








<

Ceiling Stomping

Jim took off on Friday and except for the time he took to help unload the cabinets he worked on the ceiling all day.

These are our "stomping" tool choices.
A little of new and a little of old ceiling.

Finished!



Friday, August 21, 2009

Cabinets Are In . .


... the Shop!
Hope Trent doesn't want to drive his car.

Monday, August 17, 2009

Hired Help

Jim hired a expert to help out with the floor.

Sunday, August 16, 2009

Busy Week

Things continue to progress. All the dry wall is up and all holes in ceiling, floor and walls have been plugged, patched and have at least one coat of dry wall mud . Outlets and switches are wired and working. There are a few more wires that need to be ran in the attic, but hopefully this week will be cooler and that can get done. A pretty good week considering we went to the Cardinal game twice, the State Fair and Jim was out of town for two nights.
Daisy tried to get hired on Ellie's crew but got sent back to Kansas for sleeping on the job!

Last light box was put above the sink. This one took way to much mental & physical effort, but looks good.
Order the lights last week early and are here already.

The "tech guy" was here so we put him to work installing the new thermostat.

Installed & working

Wednesday, August 5, 2009

Progress

Progress is being made nightly under the watchful eyes of
"General Contractor Ellie".
She is getting alittle concerned about where her bed is going to be.
More drywall going up

Another wall wired and closed in .

One more wall to drywall and. wire
We help Trent celebrate his 2nd birthday on Saturday,
HAPPY BIRTHDAY TRENT!


Sunday, August 2, 2009

Ice storm Mom may be back......

A few years ago we had a couple of ice/winter storms between Thanksgiving and New Years that resulted in being without power for what seemed like months but was actually many, many days both times. I was accused of not being my usual sunny self from the effects of no heat & no electricity. We always did have hot water since we had a gas water heater and rural water. I appreciated that at the time and even more now.

Well, last week Jim took out the sink and cut the water to the kitchen. If I had been without heat, power and water it really would not have been pretty.

This is our temporary kitchen sink. I know we are lucky to have a water source so close to the kitchen, but it still is not good. Being without water in what we are now calling our eating area is so far the worst part of this remodel. But I can hang in there since the finished product will be worth it.

I don't do alot of cooking during the week for us so I would have to say our diets have not suffered any. We still have the microwave, panini/grill, electric skillet and the grill so cooking is not a problem, just the clean up. Paper plates work great!