Things continue to progress. All the dry wall is up and all holes in ceiling, floor and walls have been plugged, patched and have at least one coat of dry wall mud . Outlets and switches are wired and working. There are a few more wires that need to be ran in the attic, but hopefully this week will be cooler and that can get done. A pretty good week considering we went to the Cardinal game twice, the State Fair and Jim was out of town for two nights.
Daisy tried to get hired on Ellie's crew but got sent back to Kansas for sleeping on the job!

Last light box was put above the sink. This one took way to much mental & physical effort, but looks good.
Order the lights last week early and are here already.

The "tech guy" was here so we put him to work installing the new thermostat.

Installed & working