On Saturday alittle housekeeping needed to be done before we could start cabinet installation. An air duct had to be move, clutter move and some tiles had to be pulled up. Tim got that assignment and I think he is filing a workman comp claim from that job. We needed to take all the tools and painting supplies out to the shop and start over with "cabinet installation tools".
We had to sort through the boxes and find the correct code to match the installation guide.

This is the guide we had for each wall in the kitchen.


Finally - after lunch installation began!
Cabinet #1

Things moved slow but steady and alot was learned as we moved along. By the end of a very long day three cabinets were up.

The cabinets at the top without the doors are not attached yet. They have glass fronts and will be lit from the top.
Just on the off chance that Tony LaRussa might read this blog, kitchen remodeling goes more smoothly when the Cardinals win. So could you quit stranding those guys on third.


No comments:

Post a Comment